Page 1 of 1

title speed

Posted: Wed Nov 19, 2008 3:41 pm
by videojim
Seems I cannot vary the speed of a title crawl on a screen, whether its vertical or whatever. Anybody know how to speed up the pace of a title crawl on a scene? Its slow, even if the scene is only 15 seconds long. Thanks!

Re: title speed

Posted: Wed Nov 19, 2008 4:15 pm
by Walter
Either shorten the scene and then add the title, or click on the length button and choose range. Select the trim option and move the out point until the title is the desired length. Use the preview to judge the speed of the crawl. Then render.

Re: title speed

Posted: Thu Nov 20, 2008 6:24 pm
by videojim
That did it. The crawl is always going to complete in the time of the scene, with a little time on either end.